16 October 2009

How to Get Buy-In for Project Conclusions and Recommendations

In a recent discussion with a client in the telecoms sector he told me that one of the biggest differences he sees when comparing his internal project teams to the top-notch consulting teams he sometimes uses, is the latter's ability to ensure buy-in for their conclusions and recommendations. His two questions were why the internal teams were not capable of achieving such buy-in, and what could be done about it.

Luckily, there are simple answers to both questions. In my experience, the main reason why internal project teams do not get buy-in for their conclusions and recommendations is that they do not know that a communication process is required. Usually, when I ask the team what went wrong, the answer they give is along the lines of "Nothing went wrong. We carried out the project, and presented the results to the steering committee. What else should we have done?"

This way of looking at the problem is based on a combination of factors. The first factor is related to the scope of the project, as the team has often not been explicitly told that getting buy-in for their conclusions is part of the project deliverable. Secondly, many teams (especially those with a strong technical representation) have a low understanding of the political issues related to their projects. As a consequence, they believe that "the facts will speak for themselves". Thirdly, team members who are not experienced in working on complex projects will typically develop final presentations that focus on the process that the team has followed, rather than the conclusions that they have made. This often means that the conclusions and recommendations are not clearly communicated. Finally, the project team does not usually have any experience in dealing with the group processes that typically take place within a steering committee, nor do they think about also presenting to other stakeholders who may not be represented in the steering committee.

There are three main activities that I tell my clients that need to be carried out to help the project team get the required buy-in and acceptance for project conclusions. The first of these actions needs to take place at the beginning of the project when the sponsor must clearly communicate that the project team bears responsibility for getting the required buy-in and acceptance. The second and third activities by the sponsor takes place at the beginning of the final phase of the project, when the sponsor should force and help the project team to develop a communication plan and must help the team to develop a structured final presentation (using a tool such as the Pyramid Principle). The final point will not be covered in this blog.

When I help teams develop a communication plan, we begin by making an overview of all relevant stakeholders that have an interest in the conclusions and recommendations being developed by the project team. Stakeholders who are expected to be negative towards the results are the most important to identify. For each stakeholder an overview is developed of their "hot buttons" and the dimensions of the solution to which they will need to agree. A detailed plan will then need to be developed outlining how these key issues will be communicated to the individual stakeholders.

The individual members of the steering committee should also be seen as stakeholders. This means that 1-on-1 meetings are planned with them before the final steering committee presentation. In this individual pre-meeting the SteerCo member have the opportunity to ask specific and detailed questions which then do not have to be raised in the overall meaning. In addition, any specific issues that the SteerCo member has raised in the 1-on-1 meeting can then be addressed in a structured manner in the overall presentation.

Carrying out these fairly simple and straight-forward activities aligns the internal project team with the overall methods used by top-tier consultants, and have resolved most of the issues related to the internal team's ability to get acceptance and buy-in for its conclusions and recommendations in the projects that I have carried out at my clients.

Follow the links if you are interested in more information on project planning or project management training.

11 October 2009

Determining the Appropriate Deliverables for the Finalization Phase of a Project


In previous blog entries I have suggested what the generic goals and deliverables should be for the first two phases of a complex project. This blog-entry will suggest what the generic goals and deliverables should be for the finalization phase of a complex project.

When a team enters the finalization phase of a complex project, it typically has carried out most (or all) of the key analytical activities that are required for meeting the specific project goals. The overall success of the team's work in this phase is very much determined by the work that has been carried out in the previous phase. In addition, there is seldom an explicit borderline between the project phase and the finalization phase, as the process can be iterative in nature as insights are developed and final analytical activities are carried out.

In this final phase, the main goal of the project team will be to develop and communicate the overall deliverables that have been agreed for the project. However, even if the work in the previous phases has been carried out successfully, there are still two aspects that can go seriously wrong in the finalization phase of a complex project:

- The project team is unable to develop clear-cut conclusions and recommendations based on the work they have carried out
- The team does not communicate its findings appropriately (to the right people and in the right way)

In my experience, complex projects are helped by defining a number of generic deliverables specifically for this phase that are related to avoiding these pitfalls. These generic deliverables will help ensure that the overall goals of the project are met on time and within agreed budgets, and will help ensure that project recommendations are actually implemented.

Deliverable Nr. 1: Clear conclusions and recommendations. This may seem obvious, but one of the most typical problems with internal teams carrying out complex projects is that they do not provide conclusions and recommendations. The requirement that the team must provide clear recommendations needs to be clearly stated at the beginning of the project, but should be re-iterated at the beginning of the finalization phase. This will ensure that the team understands that they are expected to come up with actionable conclusions ("go left" or "go right" not "it is possible to go left or to go right"). The specific deliverable should be a (short) presentation to the sponsor on what the team believes that the conclusions / recommendation coming out of the project are.

Deliverable Nr. 2: A pyramid supporting the conclusions / recommendations. The Pyramid Principle is a tool used by consultants to force the project team to develop a logical supportive structure for their conclusions. The basic methodology is well-defined and easy to learn. Developing a pyramid will serve both as a logical test of the conclusion / recommendation (do the results of our analysis support what we want to say?), as well as providing an excellent starting point for developing presentation and reports for the communication process. The pyramid can be tested with the sponsor at the same meeting as the suggested conclusions and recommendations.

Deliverable Nr. 3: A communication plan. Most internal project teams only work toward a final presentation to the steering committee. This often leads to problems because presenting new material to a steering committee often leads to surprises and unwillingness from the steering committee in accepting the conclusions and recommendations. A process should be put in place that allows the individual members of the steering committee to see the final presentation individually before the final presentation so that they can give their opinions, and ask their specific questions. In addition to the steering committee there are usually also other stake-holders to need to be informed in order to ensure buy-in and implementation.

If you can honestly say at the beginning of the finalization phase of your project that all of these generic deliverables will be developed, then the project has greatly enhanced its chances of successfully reaching its overall goals in such a way that the conclusions and recommendations will be accepted and implemented.

Follow the links if you are interested in more information on project planning or project management training.


02 October 2009

Determining the Appropriate Deliverables for the Work Phase of a Project


In a previous blog-entry I described the optimal deliverables for the initial phase of a project. This blog-entry will suggest what the goals and deliverables should be for the work phase of a complex project.

The work phase of a project typically covers the most time in the overall project plan and is, in my definition, the part of the project where the basic analytical and development-related activities are carried out. While the success of this phase is determined for a large part by key deliverables developed in the first phase of a complex project, there are a number of things that typically go wrong in this phase of a project as well. Typical examples of things that go wrong include:

- There is insufficient communication and feedback to the project sponsor
- The team work within the project is not optimal
- There is limited control of the project process (timing, scope creep, etc)
- There are insufficient and/or incorrect analytical activities being carried out
- There is not any process in place to control the hypotheses and conclusions being developed by the project team

This phase of the complex project is very likely to have a set of project-specific deliverables related to reaching the overall goals of the project. Examples of such project-specific deliverables could include carrying out a specified set of interviews, developing a spreadsheet model, collecting data, developing assumptions, setting out a new set of processes, etc. In addition to these project-specific deliverables, we believe that every complex project should also strive to develop a set of more general deliverables at the start of the work phase. These generic deliverables will help ensure that the overall goals of the project are met on time and within agreed budgets.

Deliverable Nr. 1: A well defined process for regular communication with the sponsor. This involves planning regular meetings between the sponsor and the project manager and team members, as well as creating the opportunity for ad-hoc meetings on an as-required basis.

Deliverable Nr. 2: An overall setting that enable the team to work together optimally. This deliverable includes a set of activities that ensure that the team members are able to use the time allocated for the project, and that as much of this time as possible is spent working together. One way of achieving this involves ensuring that the project has its own project room, and that the team members commit to being in the room at given times during the week.

Deliverable Nr. 3: A clearly defined process and appropriate tools for ensuring that milestones are met. This should include regular reports to the Steering Committee, and agreed processes to discuss and agree any expansion of scope.

Deliverable Nr. 4: Ongoing training activities for project team members to ensure that they carry out the right analytical activities in the right way. Typical team members in a complex project are not aware of all possible analytical activities that can move their project forward, nor do they have the experience to carry out these activities. A clear deliverable for ensuring project-success should therefore be the ability to provide ad-hoc analytical training and support to the team.

Deliverable Nr. 5: A Blue Team to provide feedback and constructive criticism on the project team's hypotheses and conclusions. A Blue Team is a structured meeting where the project team presents its hypotheses and potential solutions to a selected team external to the project. Such meetings have a proven track-record in improving the overall quality of projects

If you can honestly say at the beginning of the work phase of your project that all of these deliverables have been developed, then the project has greatly enhanced its chances of successfully carrying out the specific project-related analytical and developmental activities required for reaching the project goals in a timely manner.

Follow the links if you are interested in more information on project planning or project management training.


25 September 2009

Determining the Appropriate Deliverables for the Initial Phase of a Project


All complex projects consist of three basic phases: the initial (or preparatory) phase; the project (or work) phase; and the finalization phase. Each of these phases has its own challenges and pitfalls. These can be avoided by having a clear picture of what should be achieved in each of these phases. This blog-post will suggest what the goals and deliverables should be for the first phase of a complex project.


In my experience, there are a number of things that typically go wrong in the first phase of a project that severely reduce the probability of the project finishing successfully. The most common pitfalls I see in the first phase are:

- The project is not set up to deal with the right issues
- The optimal links are not developed between the sponsor and the project team
- The right resources are not allocated to the team (primarily people and time, sometimes access to expertise and/or money)
- The individuals who are assigned to the project team are not developed into a team

My suggestion is therefore that the primary goals of the preparatory phase of a project should all be focused on ensuring that these pitfalls are avoided. Reaching these goals will entail a set of activities involving the sponsor of the project, the project leader, and the team members. These activities should result in a clear set of deliverables for the preparatory phase of the project.

Deliverable Nr. 1: The appropriate sponsor for the project. This should be somebody who has an interest for the key issues to be resolved through the project, and has the time and energy to spend considerable time on the project.

Deliverable Nr. 2: The optimal project manager. The project manager needs to be a person with an affinity and understanding to the key areas to be covered by the project, the right motivation for making the project a success, and the right skills for carrying out the project.

Deliverable Nr. 3: The appropriate goals, deliverables, targets, and scope for the project. This deliverables will initially be developed in an interaction between the sponsor and the project manager, and will later be changed to reflect initial discussions with the project team.

Deliverable Nr. 4: The optimal team for carrying out the project. The composition of suggested team needs to reflect the issues that the project is dealing with, and needs to include the right mixture of skills. These can typically be divided into technical and functional skills, analytical skills, and interpersonal skills.

Deliverable Nr. 5: A realistic plan for carrying out the project. This deliverable should focus on the overall timing of the projects and intermediate milestones. The important dimension of this deliverable is that the suggested timing is realistic and is accepted by all the project team members.

Deliverable Nr. 6: A cohesive team that has joint ownership for reaching the goals and deliverables of the project within the agreed timeframe. This is a "soft" deliverable that is difficult to definitely "tick off", but a set of activities should be defined that will increase the probability of the deliverable being reached. I do not believe in stand-alone team-building activities. Therefore, my recommendation is that the key activity for achieving this is a formal (and structured) kick-off session. This session should include a "get to know" session, a training session on how to become an effective and successful team, a training session in key analytical tools, an explanation of the project (background, goals, and deliverables), and a discussion on the approach and development of a detailed work plan.

If you can honestly say at the end of the first phase of your project that all of these deliverables have been developed, then the project has greatly enhanced its chances of ending successfully. The project can then move to the next phase which will involve carrying out the key activities required for developing the overall project-specific deliverables of the project.

Follow the links if you are interested in more information on project planning or project management training.


18 September 2009

The Eighth Deadly Sin


All of you who have read my previous material know that I often speak about the Seven Deadly Sins of complex projects. Through discussions with some of my clients over the summer, I have become aware of what can be seen as the Eighth Deadly Sin. I also must admit that it says something about my long tenure in large consulting companies that this issue was not included in my original list of project problems.

The new "Deadly Sin" was brought forward by a Board member responsible for a group of project managers carrying out transformational projects across a large number of European subsidiaries. He explained that there had been a number of situations where a project lead by one of his managers had worked well and delivered a new, improved process at one of the subsidiaries. There had been a presentation to the SteerCo and with the help of some input from the Board sponsor the SteerCo had agreed to the suggested changes and the high-level implementation plan. However, six months later it turned out that the issues that the new processes were meant to address (late deliveries, low customer satisfaction, etc) had not improved and that the root cause of this was that the new processes had not been implemented. We had a broad discussion of what the reasons for this were, and agreed that one of the core reasons was that there was seldom any structured follow-up of the agreements that had been made at the end of the design phase of the project.

This problem will certainly be included in an updated version of an overview of why projects go wrong (even though "Eight Deadly Sins" does not have the same recognition-factor as "Seven Deadly Sins"). I also have to admit that the main reason that I did not include this in my original list is that the type of blue-chip consultants where I have worked earlier are usually only involved in the early phases of the projects, and are less concerned with the actual implementation. This is, of course, one of the main reasons for using internal project teams with end-to-end responsibilities that includes implementation.

Why are the results of projects not implemented? There are a number of core reasons (some quite valid) for this:

• Very often teams are more optimistic than actually warranted about the real buy-in and acceptance that they have created for their conclusions and recommendations

• Environmental changes may make the agreed changes less attractive than originally believed. An example is if the success of an agreed change to a delivery process is dependent on a new product being launched, but the launch has been delayed

• Priorities within the organization may change. An example could be if the local company has to focus all its free resources on meeting the threat of a new product launch from its main competitor

• The natural inclination of people to give higher priority to the activities that are required for making "today" successful

Issues related to truly getting the required buy-in and acceptance need to be dealt with in earlier stages of the project (see blog entries on interacting with sponsors, dealing with key stakeholders, and getting buy-in for conclusions). The other factors can be successfully dealt with by firstly developing sufficiently detailed implementation plans as part of the overall project deliverables and then putting in place and using a pro-active and structured benefits tracking process. Such a benefits tracking process should follow-up on the overall implementation plan and key milestones, it should measure the fulfillment of agreed targets, and it should include the opportunity to report back on changes in environmental factors and priorities. If the benefit tracking process needs to follow-up on a number of projects (as part of an overall program), then the benefits tracking process should also be multi-layered and focused on exceptions where decisions need to be made rather than giving the same level of detail on all projects.

The advantages of such a benefits tracking system are many, and include:

• There is even more pressure on the project to deliver good work and ensure buy-in as they know the quality of their work will be followed up

• Even if buy-in for the conclusions and recommendations coming out of the project is not 100%, it becomes more difficult not to carry out agreed actions if they are being followed up

• Pro-active follow-up will enable a top-down understanding of environmental developments and changes in priorities, and will allow the development of an agreed "Plan-B"

• The fact that implementation is being followed up makes action much more likely as people will feel the pressure of upcoming milestones and deadlines

Based on the assumption that the project is only successful when the required changes have actually been implemented, ensuring overall buy-in for the results and following up on implementation should be seen as core parts of the overall project. Follow the links if you are interested in more information on project planning or project management training.


11 September 2009

Complexity Reduction For Structurally Improving Profitability


For most of you, the complexity of your business has increased over the last ten years. Key reasons for this include increased competition, the need for segmented offers for meeting specific customer requirements, new technologies, etc. While this may have lead to higher revenues, it has more often than not also lead to structural increases in capex and higher operational costs through-out the supply-chain. In addition, I have seen numerous companies where increased complexity has lead to difficult and slow innovation processes, seriously hampering the companies’ abilities to meet new competitive threats and/or market opportunities.

Today, I see that many companies believe that complexity reduction is a fairly easy way to reduce costs. A project is started to carry out a Pareto analysis of revenues across products, and typically sees that the 80/20 rule holds, and that the tail is not profitable. The project then suggests that the 10% of the product portfolio having the lowest sales are terminated. In spite of protests from marketing & sales this is then carried out. Results, however, are more often than not disappointing, or even non-existent.

In my experience, complexity-reduction is a critical activity for a majority of businesses. While complexity-reduction in the restaurant business appears to be fairly easy, in most companies I consult to it needs to be carried out in a structured and well thought out manner where:

• It is understood that not all complexity is bad, and that the crux is to get and keep the right level of complexity for your specific company situation

• It is realized that the process is complex, will take time, and will result in only limited “low-hanging fruit” opportunities

• It is possible to put a well-organized and broadly supported project team in place to carry out the project.

If you believe that your company is suffering from too high complexity, my experience is that you will need to put in place a project to carefully consider a number of inter-linked aspects related to complexity. The first step in the process will be to understand the complexity in your organization. This will involve understanding the true complexity drivers of your current business. Typical examples include number of customers, number of products (at the lowest level of detail), number of packaging variations, number of ingredients, number of technologies, etc.

You will also need to understand the value of your market-facing complexity (i.e. those aspects which your customers see). This will involve understanding the reasons for the variations in your market-offering, analyzing the value that your customers place on the variation offered, and deciding what the consequences would be of reducing the variety you offer to the market-place. The final analytical activity will involve understanding the costs of complexity by going through a detailed activity-based costing exercise to allocate costs to the different complexity drivers (products, customers, etc).

The next step will involve carrying out a direct pruning of the product portfolio based on the preceding analytics. This portfolio reduction will not focus on the tail of the product portfolio, but will rather seek out products where the strategic value is low and costs can truly be reduced either due to a negative margin or through specific opportunities to reduce overhead through the removal of one or more products from the portfolio.

In addition to reducing the complexity that is visible to your customers, the project team will also need to look at opportunities to reduce below-the-skin (i.e. not visible to your customers) complexity. At one of my large telco clients, this is one of the key issues they are facing. They currently provide many services that are similar from a client perspective, but which are delivered through different technologies. The company is now going through a process to move delivery of all services to one platform, and expects that this will result in major savings. However, it is finding this process challenging as it requires a broad coordination across the commercial and technical organizations.

While these activities related to reducing customer-facing and internal complexity will provide you with considerable benefits through the one-off reduction in complexity, my experience is that complexity will quickly creep back if structural changes are not made to key processes. The most important process to change is the innovation / new product development process. The key goal of the changes to this process is to ensure that only complexity that truly adds value is allowed in new products. A key change to enable this is to ensure that all complexity costs are included in the business case for the new product. In addition, the improved innovation process should ensure that the production of the new product minimizes internal complexity by pushing for the use of modular designs, re-use of components, etc.

Finally, the complexity-reduction team will need to put in place (or improve) a portfolio management process to ensure that an overall portfolio view is taken in decisions related to new products, and that regular reviews are carried out to discontinue low-value / end-of-lifecycle products.

While the described process is intense and requires a substantial investment in time and resources the returns are also substantial both in reduced costs and extra revenues through faster time-to-market for critical new products. Follow the links if you are interested in more information on project planning or project management training.


04 September 2009

Helping a Project Team Develop Meaningful Conclusions


In a recent post I outlined eight signs that are leading indicators for a project that can be expected not to reach its goals and targets in a timely manner. This post will highlight how best to deal with the last of these signs, a situation where it is difficult to pin the team down on any meaningful conclusions.

Why is this a problem? A key assumption is that the project is meant to develop conclusions and recommendations. There may be projects that have been given a responsibility for "collecting all information". However, in my opinion such a project would be very wasteful. There may be projects that have been asked to only collect data and analyze data about a given issues. In my opinion this is a wrong way to set up a project, as it is impossible to carry out any meaningful analysis without having a goal and a set of hypotheses leading to conclusions.

Assuming that the core reason for the project is to develop conclusions about a key issue, then it is naturally a problem if the project team does not seem interested in doing so. In addition, this is often a fairly scary problem, as it will typically come to light late in the process (sometimes not until the final presentation). This problem therefore can, make most, if not all, of the effort and resources that have been invested in the project a waste.

What is my advice to you, as the project sponsor, to avoid this problem? The most important input from your side is at the beginning of the project. You need to start the project off with clearly defined goals, and deliverables that are very explicit regarding the type of conclusions and recommendations that you expect. You will also need to follow up on the project regularly (default is weekly) to ensure that the project is sticking to its plan and going in the right direction (i.e. will it be able to deliver the required conclusions and recommendations).

When I am helping my clients make complex projects successful I ensure that regular meetings take place with the project team (and sponsor). These regular meetings serve a number of purposes, but should also be used to ensure that the project team is working with hypotheses. Doing so will enable me to test whether proving the hypotheses will bring the team closer to its final goals. In addition, and even more importantly, working with hypotheses enables the project team to work much more effectively and efficiently. Finally, I always strongly suggest that the team is forced to test its conclusions in a Blue Team. This is a meeting with experts who are not directly involved in the project where key ideas and potential conclusions are tested, and the participants are asked for input on key issues and complications.

The previous suggestions are only helpful if the project is starting up or is fairly early in the process. What can you do if you are at the end of the project, and the team does not seem to be close to developing any conclusions? I am often called in to help in this type of situation, and it requires some fairly intense input to correct. The first step is to sit down with the team and go through the overall process of the project. I usually start with a review of the key starting points for the project, and then discuss and agree the goals and deliverables that were given to the project. These should be presented as clearly leading to conclusions and recommendations.

I then go through the work that the team has carried out and find the key data points that have come out of their analytics. These data are discussed with the team with the goal of agreeing what they mean. This is then developed into (preliminary) conclusions. These conclusions then need to be stress-tested. Are they robust? Are they well-supported? If the answer is "yes", the team can start thinking about the communications phase. If the answer is "no", the team and the sponsor need to check how much time is available, and agree the very specific activities that will make the conclusions more robust. The work that the project team carries out in this phase must be followed up very intensely to ensure that every moment is spent on work to make the conclusions more robust.

Follow the links if you are interested in more information on project planning or project management training.